Blank Gantt chart template, ready for your own project

A blank Gantt chart template with phases and tasks given generic names — Phase 1, Task 1.1 — instead of a pre-built project. It covers 4 phases and 11 tasks adding up to 21 working days, with simple dependencies already linked and a single milestone at the end. The idea is to delete the generic names and write your own project over the structure, keeping the phases and the links between tasks.

21 business days11 tasks1 milestone4 phases
Open the template, no sign-upSave to my account Free, no sign-up. Create an account to save.

Download the template

Want dates that adjust on their own when something slips? Open the same template in Great Gantt, no sign-up. Dates in the file start on the next business day.

WK 1
WK 2
WK 3
WK 4
WK 5
Phase 1: planning
Task 1.1
Task 1.2
Task 1.3
Phase 2: execution
Task 2.1
Task 2.2
Task 2.3
Task 2.4
Phase 3: review
Task 3.1
Task 3.2
Phase 4: closure
Task 4.1
Task 4.2
◆ Project completed
Schedule preview (calendar weeks from the start)
A TEMPLATE FOR REAL WORK

Turn Blank Gantt chart template into a real project

Start with a professional structure and customize dates, owners, and deliverables in the editor. The schedule recalculates dependencies and is ready to share with clients and your team.

  • Ready-made phases and tasks
  • Business-day dates recalculate
  • One link, always up to date
Create my project

Phases and tasks in this template

1. Phase 1: planning

  • Task 1.13 business days
  • Task 1.22 business days
  • Task 1.32 business days

2. Phase 2: execution

  • Task 2.14 business days
  • Task 2.23 business days
  • Task 2.33 business days
  • Task 2.42 business days

3. Phase 3: review

  • Task 3.12 business days
  • Task 3.21 business days

4. Phase 4: closure

  • Task 4.12 business days
  • Task 4.21 business days
  • Project completedMilestone

What goes in each column of a Gantt chart

ColumnWhat to writeExample
TaskA verb and a deliverable, small enough to estimateDraft the report outline
DurationWorking days, not calendar days3 working days
PredecessorThe number of the task that must finish firstTask 4
OwnerOne person, never a whole teamAlex
MilestoneA zero-duration deliverable, not a regular taskProject completed (0 days)

If a row has no specific person as its owner, it is probably not ready to go into the schedule yet.

How to fill in this blank Gantt chart

What a blank Gantt chart template is for

The other templates on Great Gantt come with a whole project already built in — construction, a thesis, a product launch. This one is different: instead of a specific project, it gives you just the skeleton. Four generic phases, three tasks each (except the last), and a closing milestone, already linked by simple dependencies.

It is for people who already know how they want to structure their own project but do not want to build the dependency links from scratch, and for people learning how a Gantt chart works who want a small example to practice on before applying it to a real project.

The difference from a blank spreadsheet is in the dependencies: Task 2.1, for instance, only starts once tasks 1.2 and 1.3 are both done. Once you rewrite the names with your project's content, those links keep working.

The template's structure: 4 phases, 11 tasks, 1 milestone

Numbers in parentheses are the working days the template starts with — adjust them to your project's actual size.

  • Phase 1: planning — Task 1.1 (3), Task 1.2 (2) and Task 1.3 (2), the last two running in parallel after the first.
  • Phase 2: execution — Task 2.1 (4) and Task 2.2 (3) running in parallel after planning, Task 2.3 (3) after 2.1, and Task 2.4 (2) after both 2.2 and 2.3.
  • Phase 3: review — Task 3.1 (2) and Task 3.2 (1), one after the other.
  • Phase 4: closure — Task 4.1 (2), Task 4.2 (1) and the project completed milestone, with zero duration.

How to fill in a Gantt chart, step by step

Order matters: define scope before estimating duration, and estimate duration before linking dependencies. Skipping a step is the most common way a schedule ends up wrong.

  • Scope and deliverables. Write, in one sentence, what the project delivers at the end. Without that, every task you list afterward is a guess.
  • Break it into tasks. Split the deliverables into pieces small enough to estimate with confidence, usually one to five working days each.
  • Estimate duration. Ask the person doing the work for a duration instead of guessing it yourself. Estimates made only by whoever is coordinating tend to come in short.
  • Finish-to-start dependencies. For every task, ask what has to be done before it can start. That link is what makes the whole schedule move when one date changes.
  • Milestones. Mark the checkpoints that matter to people outside the team — approval, delivery, launch — with zero duration.
  • Critical path and slack. Check which tasks have no room to slip (delaying any of them delays the whole project) and which have a few spare days. In this structure, only Task 2.2 has slack, about 4 working days.
  • Updates. Once the project starts, mark percent complete for every task weekly and compare it against the baseline you saved at the start.
Common mistakes when filling in a blank Gantt chart

Most problems show up before the first task even starts, while the structure is still being built.

  • A task too big to estimate. If a task runs longer than two weeks, it is probably really two or three smaller tasks with visible intermediate deliverables.
  • A dependency that is not really a dependency. Chaining everything in sequence, even when two tasks could run in parallel, stretches the timeline for no reason.
  • A milestone with more than zero duration. A milestone that takes two days stops working as a checkpoint and becomes just another task.
  • A generic owner, like "the marketing team" instead of one person. Without a name attached, nobody feels responsible for the task.
  • Forgetting to save a baseline. Without one, there is no way to compare what was planned against what actually happened, and every conversation about delay turns into opinion.
Who this blank template fits

Someone who has run a few projects before and knows how to structure their own, but does not want to rebuild phases and dependency links from scratch on every new project.

Someone learning how a Gantt chart works who wants a small example with dependencies and a milestone to see how the pieces fit together before applying it to a real project.

Someone training another person — an intern, a new project manager — who needs a hands-on exercise without the risk of messing up a real schedule at the company.

Frequently asked questions

Where do I start when filling in a blank Gantt chart?

With scope, not tasks. Write down what the project delivers at the end first, then break that into small tasks and estimate each one's duration. Leaving scope undefined until after you already have a task list is the most common reason to redo everything halfway through.

How many tasks should a Gantt chart have?

There is no fixed number. This template uses 11 tasks across 4 phases, a size that fits on one screen without too much scrolling. A practical rule: if a task runs longer than two weeks, split it; if a phase only has one task, it may not need to be its own phase.

What is a finish-to-start dependency, and why does the template already have them?

It is the most common type of link between tasks: one can only start once the other has finished. The template already has a few of these set up, like the one connecting Task 1.1 to Tasks 1.2 and 1.3, so you can see the pattern working before creating your own.

How do I find the critical path on a blank Gantt chart?

The critical path is the sequence of tasks with no slack at all: delaying any of them pushes back the project's end date. In this template, 11 of the 12 items are on the critical path; only Task 2.2 has slack, about 4 working days. Great Gantt's editor highlights the critical path automatically, so you do not need to calculate it by hand.

Can I download this blank Gantt chart as Excel or PDF?

Yes, either with the generic structure or already filled in with your own task names. The editor's export button generates an Excel file with dates computed in working days, or a PDF to share. Exporting is included in the free plan.

When should I use this blank template instead of a ready-made one, like construction or a thesis?

Use a ready-made template when your project closely matches the example (a build, a thesis, a product launch): you save time reusing typical tasks and durations. Use the blank template when your project does not match any of the ready-made examples and you just want the phase, dependency and milestone structure, with nothing specific to delete first.

See also:Simple project timelineConstruction scheduleCorporate eventGantt chart or spreadsheet: when to use each